Anti-foot-gun planning standard
Anti-foot-gun planning standard
Section titled “Anti-foot-gun planning standard”This is a Tier 1 normative document.
All planning documents in planning-meta/ must conform to this standard.
Purpose
Section titled “Purpose”Prevent planning mistakes that are known to create avoidable implementation hazards.
The standard focuses on planning quality defects, not code style defects.
Blocker classes
Section titled “Blocker classes”A planning change is blocked if any blocker class is violated.
B1: Semantic ownership ambiguity
Section titled “B1: Semantic ownership ambiguity”- Planning text allows multiple owners for the same semantic behavior without an explicit transition policy.
- Planning text allows adding new semantics to compatibility-only legacy pathways.
B2: Silent fallback acceptance
Section titled “B2: Silent fallback acceptance”- Planning text allows fallback behavior without visibility, metrics, or acceptance constraints.
- Planning text normalizes fallback as indefinite behavior.
B3: Contract drift permissiveness
Section titled “B3: Contract drift permissiveness”- Planning text changes interface/contract assumptions without requiring synchronized downstream references and fixtures.
B4: Gate/evidence ambiguity
Section titled “B4: Gate/evidence ambiguity”- Planning text declares milestones or gates without explicit pass/fail evidence requirements.
B5: Deferral without accountability
Section titled “B5: Deferral without accountability”- Planning text introduces deferrals/exceptions without owner, expiry, closure test, and review cadence.
B6: Authority inversion
Section titled “B6: Authority inversion”- Tier 2/3 text contradicts Tier 1 policy and is not reconciled through governance protocol.
B7: Terminology ambiguity
Section titled “B7: Terminology ambiguity”- Planning text uses non-canonical terms that can alter interpretation of rules, gates, or ownership.
B8: Repo-reality mismatch
Section titled “B8: Repo-reality mismatch”- Planning text claims behavior that contradicts current code-path reality without explicitly marking it as target-state.
- Planning text conflates
VOX_WEBIR_VALIDATEwith reactive WebIR emit semantics (there is no separate reactive-view env toggle; validation gates structure, reactive emit is WebIR-first). - Planning text references incomplete gate subsets when a canonical full gate table exists.
Mandatory planning questions (must be answered for high-risk sections)
Section titled “Mandatory planning questions (must be answered for high-risk sections)”- Who owns the semantic behavior described here?
- Where is compatibility-only behavior explicitly marked?
- What fallback paths are allowed, and how are they measured?
- What evidence proves milestone/gate readiness?
- What are the stop conditions and escalation routes?
- What is the rollback assumption at planning level?
- If deferred, who owns closure and when does it expire?
- Which canonical terms are used, and where are they defined?
If any answer is missing, the section is incomplete.
Required anti-foot-gun controls by planning area
Section titled “Required anti-foot-gun controls by planning area”For ownership-related sections
Section titled “For ownership-related sections”- must define one owner and one compatibility policy,
- must define transition conditions for any temporary dual ownership.
For gate-related sections
Section titled “For gate-related sections”- must define evidence classes,
- must define fail conditions and escalation behavior.
For exception-related sections
Section titled “For exception-related sections”- must define class, owner, expiry, closure test, and retirement workflow.
For deep operational plan sections
Section titled “For deep operational plan sections”- must include failure mode table and controls,
- must include stop conditions.
Red flag patterns
Section titled “Red flag patterns”These phrases or patterns are not acceptable without refinement {
- “handle later” without deferral metadata,
- “safe enough” without evidence criteria,
- “temporary fallback” without metrics and expiry,
- “as needed” for milestone acceptance,
- “generally aligned” for authority resolution.
Repo-specific red flags:
- “WebIR is default production emit path” without current-path caveat.
- “G1-G5 complete” without reconciling against the canonical
G1-G6table. - “parity passed” without naming the fixture/test surface used as evidence.
Exception mechanism
Section titled “Exception mechanism”Exceptions to this standard are allowed only when all are present:
- explicit owner,
- explicit expiry date or review milestone,
- explicit closure test,
- explicit risk statement,
- explicit approver.
Exceptions without all five fields are invalid.
Enforcement model
Section titled “Enforcement model”Planning reviewers must reject documents that violate blocker classes.
Review checklists should include this standard as a mandatory section.
Relationship to other planning docs
Section titled “Relationship to other planning docs”- Uses taxonomy from
06-planning-taxonomy-glossary.md - Uses evidence definitions from
08-milestone-gate-definition-spec.md - Uses exception lifecycle from
09-exception-deferral-policy.md - Uses authority model from
01-master-planning-index.md
Acceptance criteria
Section titled “Acceptance criteria”This standard is active when:
- all planning docs reference it for high-risk sections,
- reviewer checklists enforce blocker classes,